What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1994, with 16 homes, on a 5,908 sq ft lot.
- Built
- 1994
- Last altered
- 2017
- Floors
- 5
- Residential units
- 16
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2/R6A
- Lot area
- 5,908 sq ft
- Building area
- 18,905 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 13 notices on file; the most recent was issued Apr 14, 2025.
- Construction
Issued Apr 14, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMMPLIANT MANNER. OBSERVED MULTIPLE AREAS OF UNFINISHED FACADE AT ALL EXPOSURES. MISSING OF CLADDING PROJECT APPEARS TO BE CLOSED FOR A PERIOD OF TIME. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 22, 2024 — MISCELLANEOUS VIOLATION. AT TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 1 (NORTH ELEVATION) IMPROPERLY SUPPORTED/SECURED PROTECTION NETTING AT MULTIPLE LOCATIONS WITH HOLES & OPENINGS WERE OBSERVED REMEDY: COMPLY WITH CODE AND SECURE NETTING
- Construction
Issued Oct 22, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED: PROTECTION FENCE AT EXPOSURE 2 (E ELEV) IN DISREPAIR AND FENCE HAD NO PERMIT IN PLACE. EXP 1 (N ELEV) & EXP 4 (W ELEV) FACADE HAD MISSING SECTIONS & EXP 1 (N ELEV) PROTECTION NETTING NOT PROPERLY SECURED. REMEDY: REPAIR AND/OR REPLACE
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00040126-P3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00040126-P3
- BBL
- 3023750012
- Postal code
- 11211 · 3526 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source