What the filing says
A public-record reading of the proposed work.
Addition and replacement of plumbing fixtures, hose connections and floor drains at locker rooms, toilet and shower areas. New floor drains and hose connections at natatorium. Other related work to the pool.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1928, on a 314,000 sq ft lot.
- Built
- 1928
- Last altered
- 1959
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R3-2
- Lot area
- 314,000 sq ft
- Building area
- 46,170 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 28 notices on file; the most recent was issued Jun 30, 2023.
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q00971472-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q00971472-S2
- BBL
- 4157360001
- Postal code
- 11691 · 195 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0