What the filing says
A public-record reading of the proposed work.
Propose minor structural work as per plan.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story office building built in 1920, on a 2,000 sq ft lot.
- Built
- 1920
- Last altered
- 2016
- Floors
- 6
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- R6
- Lot area
- 2,000 sq ft
- Building area
- 8,237 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Oct 19, 2022.
- Construction
Issued Oct 19, 2022 — FTM BLDG IN A CODE COMPLIANT MANNER. CONDITIONS HAS NOT CHANGED SINCE THE LAST VIOLATION #040422LL31201JC WAS ISSUED. BLDG IS A STALLED CONSTRUCTION SITE AND NO WORK IS ONGOING. MASONRY WORK IS INCOMPLETE WITH ACTIVE PERMITS. NOT SIGN OF WORKERS. REMEDY: COMPLY WITH CODE
- Construction
Issued Apr 4, 2022 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNERBUILDING IS A STALLED CONSTRUCTION SITE AND HAS NO ON GOING WORKMASONRY WORK I WORK HAS BEEN STALLED WITH ACTIVE PERMITS COMPLY WITH CODE
- Construction
Issued Jul 15, 2021
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00491974-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00491974-I1
- BBL
- 3056860016
- Postal code
- 11220 · 2080 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 6
- Existing dwelling units
- 2
- Proposed dwelling units
- 0








