NYC DOB record · B00594030-I1

824 60 Street

824 60 Street, Brooklyn, NY 11220

Alteration filing in Sunset Park (Central), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00594030-I1

824 60 Street

Brooklyn, NY 11220

Alteration filing · status dated Jun 6, 2023

Current record
Approved
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00594030-I1 as a alteration filing at 824 60 Street, Brooklyn, NY 11220. Its latest published status category is Approved, dated Jun 6, 2023. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jun 6, 2023
Proposed scale
4 proposed dwelling units
Applicant of recordSee the 216 filings that name Ameriland Brook LLC
FiledSep 15, 2021
Current recordApproved
Proposed scale4 units
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Install 8' construction fence at above address in conjunction with job#321972200. no change in use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00594030-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00594030-I1
BIN
3141158
BBL
3057140015
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4
fence