What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1907, with 37 homes, on a 10,600 sq ft lot.
- Built
- 1907
- Floors
- 6
- Residential units
- 37
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 10,600 sq ft
- Building area
- 57,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 35 open notices on record for this building, out of 77 notices on file; the most recent was issued Jun 30, 2026.
- Construction
Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER: DOB VIOLATION #031726CLL2 0301YC REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY A PE/RA & SUBMIT A REPORT TO FACADE VIA EMAIL BY 3/25/26. AS OF 06/30/2026, NO HAND ON INSPECTION REPORT SUBMITTED TO FACADE UNIT REMEDY: COMPLY WITH DOB VIOLATION #031726CLL20301YC IMMEDIATELY
- Construction
Issued Mar 17, 2026 — FTM FACADE & APPURTANCES. LARGE SECTION OF FIRE ESCAPE STONE ENCASEMEN DISLODGING & FALLING ON TO SIDEWALK SHED BELOW. EXP2 E ELEV & SPALLING LOOSE BRICKS W/DEEP OPEN MORTAR JOINTS/PARAPET. REMEDY:OWNER TO IMMEDI RETAIN SVCS OF NYS RDP W/QEWI CERT TO INSPECT & EVALUATE 100% MASONRY FACADE, PARAP &FIRE ESCAPE (HANDS ON) REP TO FACADES@BUILDINGS.NYC.GOV
- Fail to certify class
Issued Oct 2, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
32 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00984179-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00984179-I1
- BIN
- 2005012
- BBL
- 2026770070
- Postal code
- 10459 · 88 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 37
- Proposed dwelling units
- 37