NYC DOB record · B00530342-I1

8301 Shore Road

8301 Shore Road, Brooklyn, NY 11209

Alteration filing in Bay Ridge, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00530342-I1

8301 Shore Road

Brooklyn, NY 11209

Alteration filing · status dated Feb 17, 2022

Current record
Approved
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00530342-I1 as a alteration filing at 8301 Shore Road, Brooklyn, NY 11209. Its latest published status category is Approved, dated Feb 17, 2022. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Feb 17, 2022
Proposed scale
4 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3152318Applicant of recordSee the 46 filings that name Eme Consulting Engineering Group
FiledJun 10, 2021
Current recordApproved
Proposed scale4 stories
Recorded cost$121,000

What the filing says

A public-record reading of the proposed work.

Interior removal of non-load bearing partitions, doors, millwork, and plumbing fixtures. install new partitions and doors. install new sink in existing location. provide and install new split unit, two indoor ac units, and fresh air duct.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story educational building built in 1940, on a 550,000 sq ft lot.

Built
1940
Last altered
2006
Floors
3
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
PARK
Lot area
550,000 sq ft
Building area
286,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 84 notices on file; the most recent was issued Sep 23, 2024.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00530342-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00530342-I1
BBL
3060130001
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0
General constructionmechanical