What the filing says
A public-record reading of the proposed work.
P.S. 721K: Subsequent filing of plumbing work type. Plumbing and drainage improvement work, including separation of storm piping from the sanitary in the building, cut and cap existing underground. storm piping and installation of a new one in the ceiling
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1909, on a 60,000 sq ft lot.
- Built
- 1909
- Last altered
- 2009
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 60,000 sq ft
- Building area
- 110,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 47 notices on file; the most recent was issued Dec 16, 2024.
- Immediate
Issued Dec 16, 2024 — INSTALL APPROXIMATELY 50 LINEAR FEET OF SIDEWALK SHED TO SAFEGUARD THE PUBLIC AND ENCLOSE POTENTIAL DEBRIS FALL ZONE
- Construction
Issued Dec 13, 2024 — AT TIME OF INSPECTION OBSERVED STUCCO/DEBRIS FALLING FROM ADJACENT PROPERTY (2045 84 STREET) ONTO SCHOOL PLAYGROUND AT EXPOSURE#2 OF PROPERTY. DUE TO DEBRIS FALLING FROM ADJACENT PROPERTY, EXPSOURE#2 OF SCHOOL PLAYGROUND AREA MUST BE VACATED.
- Local law 62/91 - boilers
Issued Aug 16, 1993
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01363954-P3.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01363954-P3
- BBL
- 3063290032
- Postal code
- 11214 · 1319 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








