What the filing says
A public-record reading of the proposed work.
Proposed to horizontal extension in cellar 1st & 2nd floor left side of the building. no change in use, egress & occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 1935, on a 4,000 sq ft lot.
- Built
- 1935
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3X
- Lot area
- 4,000 sq ft
- Building area
- 2,184 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jun 24, 2026.
- Construction
Issued Jun 24, 2026 — LEFT SIDE EXISTING ATTACHED GARAGE WITH ROOF TERRACE WAS DEMOLISHED WITHOUT A PERMIT. 2ND FLOOR EXISTING ENTRY DOOR WITH OPENING AT LEFT SIDE THAT PROVIDE ACCESS TO THE ROOF TERRACE STILL IN PLACE. THIS IS A POTENTIAL FALL HAZARD. PARTIAL VACATE ORDER ISSUED FOR LEFT SIDE 2ND FLOOR ENTRY DOOR WAY.
- Construction
Issued Jun 24, 2026 — OBSERVED THE EXISTING ATTACHED GARAGE AT LEFT SIDE OF THE EXISTING ONE FAMILY RESIDENTIAL BUILDING WAS COMPLETELY DEMOLISHED WITHOUT A PERMIT & EXISTING WOODEN CUT BEAMS IS EXPOSED & ATTACHED TO THE LEFT SIDE EXTERIOR BRICK WALL OF THE EXISTING ONE FAMILY RESIDENTIAL BUILDING.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01255052-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01255052-I1
- BIN
- 4210944
- BBL
- 4098610032
- Postal code
- 11432 · 146 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1