What the filing says
A public-record reading of the proposed work.
Full demolition of 3 story House of Worship to comply with OP-32 Emergency Declaration, DEC# 20352
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story place of worship built in 1963, on a 9,200 sq ft lot.
- Built
- 1963
- Floors
- 3
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 9,200 sq ft
- Building area
- 7,176 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 25 open notices on record for this building, out of 27 notices on file; the most recent was issued Jun 9, 2026.
- Emergency
Issued Jun 9, 2026 — REMEDY: FULLY DEMOLISH THE BUILDING AND GRADE & FENCE SITE
- Emergency
Issued Jun 9, 2026
- Construction
Issued Jun 2, 2026 — EMERGENCY WORK ORDER.THE BLDG IS IN A STATE OF SEVERE DISRPAR W/PRTLLY CLLPSD 1STFL,FAILNG FLR JOISTS@1ST&2NDFLRS,SEVERELY DTRIORTD STAIR STRCTRE(STEPS MISSNG).THE BLDG IS STRCTRLLY CMPRMSD,@RISK OF FRT.OWNR TO IMMED RTAIN DOB REG CNTRCTR TO INSTLL TGHTBRD CNTRCT FNCE MINIMUN 15FT FRM THE BLDG@ECP3&4(EAST&SOUTH)
22 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01458282-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01458282-I1
- BIN
- 2002905
- BBL
- 2024740032
- Postal code
- 10451 · 279 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source