What the filing says
A public-record reading of the proposed work.
Provide and install temporary boarding at the window opening using timber planks and plywood sheets to secure the fire-damaged building until permanent repairs are completed.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story place of worship built in 1949, on a 4,920 sq ft lot.
- Built
- 1949
- Floors
- 2
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 4,920 sq ft
- Building area
- 7,872 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 25 open notices on record for this building, out of 28 notices on file; the most recent was issued Aug 19, 2026.
- Construction
Issued Aug 19, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350707(060226FEU20403KR) DATED 06/02/2026 REQUIRING THE BUILDING TO BE REPAIRED UNDER PERMIT STARTING BY 07/13/2026.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #350707 (060226FEU20403KR) DATED 06/02/2026 TO REPAIR THE BUILDING UNDER PERMIT
- Construction
Issued Jun 24, 2026 — FAILURE TO MAINTAIN BLDG: CRACKED, SPALLING DECORATIVE MASONRY ON EXP 1. OBSERVED ON EXP 1 E.ELEV;CRACKS IN STUCCO @ PARAPET; CRACK IN MORTAR JOINTS @ 2ND FL CORRODED SAGGING MORTARLINTEL; STEP CRACKIN BRICK JOINT 2ND FL-; EXP 2, BROKEN WINDOW;/ PARAPET SEVERAL LOCATIONS, ERRODED MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE DAMAGE MASONRY
- Construction
Issued Jun 24, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER 3350706(060226FEU20402KR) DATED 06/02/26 REQUIRING OWNR TO RTAIN NYSPE&DOB REG CNTRCTR TO IMMED 1.RMVE OR SECURE UNSTABLE WNDWS&FRAMES,RMVE ALL LOOSE MATERIL IN DANGR OF FALLNG,2.SEAL ALL OPENINGS&WEATHRPRF AS REQ'D.ALL WRK TO BE PERFRMD UNDR DRCT&CONT SPRVSN OF NYSPE.PE TO EVAL CONDITIONS&SUBMIT MEANS&METH
22 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01431092-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 64,552 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01431092-I1
- BBL
- 2024740054
- Postal code
- 10451 · 102 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0