NYC DOB record · B00619892-S4

844 Bedford Avenue

844 Bedford Avenue, Brooklyn, NY 11205

New building filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00619892-S4

844 Bedford Avenue

Brooklyn, NY 11205

New building · status dated Feb 13, 2024

Current record
Closed or withdrawn
Proposed scale
6 stories
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00619892-S4 as a new building at 844 Bedford Avenue, Brooklyn, NY 11205. Its latest published status category is Closed or withdrawn, dated Feb 13, 2024. The filing records 6 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Closed or withdrawn
Latest status date
Feb 13, 2024
Proposed scale
6 proposed stories and 10 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3427401Applicant of recordSee the 451 filings that name Structural Engineering Technologies
FiledNot recorded
Current recordClosed or withdrawn
Proposed scale6 stories
Recorded cost$4,000

What the filing says

A public-record reading of the proposed work.

Foundation, structural, & earthwork specifications filed in conjunction with nb application #b00619892-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    01

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00619892-S4
BBL
3019000047
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
6
Existing dwelling units
Empty in the source
Proposed dwelling units
10
General constructionStructural workFoundation workEarthwork