NYC DOB record · M08014369-I1

845 Columbus Avenue

845 Columbus Avenue, Manhattan, NY 10025

Alteration filing in Upper West Side-Manhattan Valley, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M08014369-I1

845 Columbus Avenue

Manhattan, NY 10025

Alteration filing · status dated Sep 22, 2026

Current record
Approved
Proposed scale
20 stories
Dwelling units
160
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M08014369-I1 as a alteration filing at 845 Columbus Avenue, Manhattan, NY 10025. Its latest published status category is Approved, dated Sep 22, 2026. The filing records 20 proposed stories and 160 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
20 proposed stories and 160 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1081299Applicant of recordSee the 16 filings that name Rktb Architects, P.C.
FiledNov 3, 2022
Current recordApproved
Proposed scale20 stories
Recorded cost$1.4M

What the filing says

A public-record reading of the proposed work.

Herewith filing roofing replacement limited facade work at bulkheads as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story elevator apartment building built in 1958, with 897 homes, on a 340,742 sq ft lot.

Built
1958
Floors
17
Residential units
897
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
340,742 sq ft
Building area
689,340 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M08014369-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M08014369-I1
BBL
1018360001
Review type
Standard Plan Examination
Existing stories
20
Proposed stories
20
Existing dwelling units
160
Proposed dwelling units
160
General construction