NYC DOB record · B00007416-I1

846 Manhattan Avenue

846 Manhattan Avenue, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00007416-I1

846 Manhattan Avenue

Brooklyn, NY 11222

Alteration filing · status dated Aug 10, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00007416-I1 as a alteration filing at 846 Manhattan Avenue, Brooklyn, NY 11222. Its latest published status category is Recorded as completed, dated Aug 10, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 10, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3065131Applicant of recordSee the 140 filings that name Mcrb Service Corp
FiledDec 22, 2017
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$5,500

What the filing says

A public-record reading of the proposed work.

Installation of heavyduty sidewalk shed filed for remedial reparis. no change in use occupancy or egress under this application. sidewalk shed shall comply with 2014 buildind code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 1884, with 6 homes, on a 2,527 sq ft lot.

Built
1884
Floors
4
Residential units
6
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C4-3A
Lot area
2,527 sq ft
Building area
6,020 sq ft
Historic district
Greenpoint Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 17 notices on file; the most recent was issued Aug 24, 2026.

  • Construction

    Issued Aug 24, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS AT EXPOSURE 4 EAST ELEVATION. DEFECTED COPING STONE, SPALLED SPALLING AND DAMAGED JOINTS. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Oct 22, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 4 (SOUTH ELEVATION) LOOSE MASONRY, DETERIORIATED MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00007416-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00007416-I1
BBL
3025740046
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
Sidewalk shed