What the filing says
A public-record reading of the proposed work.
Plumbing work associated with interior renovation of fire damaged 2 family house. No change in use, egress or occupancy. All as per plans and applications.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1920, on a 1,568 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 1,568 sq ft
- Building area
- 1,444 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 6 notices on file; the most recent was issued Sep 2, 2025.
- Immediate
Issued Sep 2, 2025 — PROVIDE A OCNSTRUCTION TIGHT-BORD FENCE - APPX 20 LINEAR FEET @ EXP 2 REAR A WRAP AROUND TO EXP#3 (APRX 34 LINEAR FEET) AND WRAPAROUND TO E XP #4 REAR (APPX 10 LINEAR FEET) TO SEFEGUARD THE PUBLIC AND SURRANDIN G PROPERTIES
- Construction
Issued Aug 1, 2025 — STRUCTURE RENDERED NON COMPLIANT . AT TIME OF INPSECTION OBSERVED FIRE , WAER & SMOKE DAMAGE TO REAR OF PREMISES BASEMENT, 1ST, 2ND, EXPO #3 EXTERIOR WALL MISSING ,DECK FIRE DAMAGE FLOOR JOIST.. OWNER TO HIRE NYSPE SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 10 DAYS ADDRESSING ALL CONDITIONS WITH PLANS, PHOTOS RECOMENDING PLANS REPAIR
- Immediate
Issued Aug 1, 2025 — SEAL ALL ACCESSIBLE OPENINGS TO PREVENT ENTRY AND SAFEGUARD THE PUBLIC
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01455802-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01455802-S1
- BIN
- 2043242
- BBL
- 2040420011
- Postal code
- 10462 · 340 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








