NYC DOB record · X00558989-I1

849 Crotona Park North

849 Crotona Park North, Bronx, NY 10460

New building filing in Tremont, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00558989-I1

849 Crotona Park North

Bronx, NY 10460

New building · status dated Sep 21, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00558989-I1 as a new building at 849 Crotona Park North, Bronx, NY 10460. Its latest published status category is Approved, dated Sep 21, 2026. The filing records 6 proposed stories and 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 21, 2026
Proposed scale
6 proposed stories and 8 proposed dwelling units
The building, not the filingEvery filing at BIN 2131266, with the parcel and violation recordApplicant of recordSee the 4 filings that name Eq Architecture PLLC
FiledOct 5, 2021
Current recordApproved
Proposed scale6 stories
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Construction of a six (6) story new building - adult homes and enriched housing (i-1) as per the plans filed herewith.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story health facility built in 2024, on a 3,509 sq ft lot.

Built
2024
Last altered
2023
Floors
6
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R7-1
Lot area
3,509 sq ft
Building area
13,777 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00558989-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00558989-I1
BBL
2029570014
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
6
Existing dwelling units
Empty in the source
Proposed dwelling units
8
General construction