NYC DOB record · B00476587-I1

850 Meeker Avenue

850 Meeker Avenue, Brooklyn, NY 11222

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00476587-I1

850 Meeker Avenue

Brooklyn, NY 11222

Alteration filing · status dated Nov 15, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00476587-I1 as a alteration filing at 850 Meeker Avenue, Brooklyn, NY 11222. Its latest published status category is Approved, dated Nov 15, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 15, 2021
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 3330105, with the parcel and violation recordApplicant of recordSee the 61 filings that name R Scott Lewis PE PC
FiledNov 2, 2021
Current recordApproved
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

The public record does not include a detailed scope description.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story warehouse built in 1950, on a 27,770 sq ft lot.

Built
1950
Floors
1
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
M3-1
Lot area
27,770 sq ft
Building area
8,371 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Oct 13, 2023.

  • Construction

    Issued Oct 13, 2023 — COMM'S ORDER APPROX. 50 FT MONOPOLE SIGN STRUCTURE REMEDY: OWNER TO IMMEDIATELY ENGAGE A NYS PE EXPERIENCED W/MONOPOLE SIGN STRUCTURES TO INSPECT STRUCTURE INCLUDING VISUAL INSP. ENGINEERING & MATERIALS TESTING EVALUATION OF ALL COMPONENTS OF STRUCTURE & FOUNDATION ETC IMMEDIATELY NOTIFY DOB OF ANY UNSAFE CONDITION WITHIN 60 DAYS OF THIS

  • Construction

    Issued Apr 21, 2017 — FAILURE TO CORRECT UNLAWFUL ARTERIAL DOUBLE FACED MONOPOLE SIGN STRUCTURE THAT EXCEES THE SURFACE AREA LIMITS IN AN M3-1 ZONE ERECTED & MAINTAINED W/O A PERMIT.ANY POSSIBLE NON CONFORMING USE STATUS LOST AS SIGN WAS USED TO DISPLAY ADVERTISING OR WAS VACANT FOR 2 OR MORE YEARS

  • Construction

    Issued Dec 7, 2013 — (28-250.4)UNREG

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00476587-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,302 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00476587-I1
BBL
3028050017
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
Foundation workEarthwork