What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story place of worship built in 1852, on a 14,450 sq ft lot.
- Built
- 1852
- Floors
- 2
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 14,450 sq ft
- Building area
- 13,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 18 notices on file; the most recent was issued Jun 24, 2026.
- Immediate
Issued Jun 24, 2026 — FULLY DEMOLISH THE BUILDING. GRADE & FENCE SITE. COORDINATE ALL WORK WITH FDNY BATTALION 37 (718-465-8300) AND FIRE MARSHALS (718-492-1880) TO ASSIST WITH SEARCHES/RECOVERY AND INVESTIGATIONS
- Construction
Issued Jun 24, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350713 (062226FEU30401KR) DATED 6/22/2026 REQUIRING OWNERSHIP TO RETAIN A NYSPE,DEMO-ENDORSED CONTRACTOR,&ASBESTOS CNTRCTR TO FULLY DEMO THE BLDG IN COORDINATION W/ FDNY&FRE MRSHLS.AS OF 6/24/26,OWNRSHIP HAS NOT RETAIND A FULL DEMO TEAM,INCLDNG DEMO ENDRSD&ABSESTOS CNTRCTR,&NO DEMO WRK HAS STARTD
- Construction
Issued Jun 22, 2026 — EMERGENCY WORK ORDER.THE BLDG SUSTAIND SEVERE FIRE DUE TO FIRE ON/ARND 6/19/26.APPROX 60& OF SANCTUARY ROOF CLLPSD&OPEN W/UNBRCD EX1,2,4 SANCTUARY WALLS.THE REMAINING SANCT ROOF WAS FIRE DMGD.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #350713 (062226FEU30401KR)DATED 6/22/2026
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01425499-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01425499-I1
- BBL
- 3032640001
- Postal code
- 11221 · 3350 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








