NYC DOB record · B01398668-I1

857 President Street

857 President Street, Brooklyn, NY 11215

Alteration filing in Park Slope, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01398668-I1

857 President Street

Brooklyn, NY 11215

Alteration filing · status dated Nov 6, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01398668-I1 as a alteration filing at 857 President Street, Brooklyn, NY 11215. Its latest published status category is Recorded as completed, dated Nov 6, 2026. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 6, 2026
Proposed scale
4 proposed dwelling units
Applicant of recordSee the 41 filings that name Hardie & Associates Consulting ENG.
FiledMay 12, 2026
Current recordRecorded as completed
Proposed scale4 units
Recorded cost$19,500

What the filing says

A public-record reading of the proposed work.

Proposed plumbing work on partial cellar floor of a 4 story residential building.install new (3) gas meter, new (3) gas hot water heater, relocate exist (1) gas hot waterheater and remove of exist (1) gas furnace @ cellar floor. no change in use, egress a

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3.5-story walk-up apartment building built in 1888, with 4 homes, on a 2,000 sq ft lot.

Built
1888
Last altered
1966
Floors
3.5
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7B
Lot area
2,000 sq ft
Building area
4,260 sq ft
Historic district
Park Slope Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 8, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01398668-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 94,142 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01398668-I1
BIN
3024662
BBL
3010650052
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4