NYC DOB record · Q08020327-Z2

86-53 Grand Avenue

86-53 Grand Avenue, Queens, NY 11373

New building filing in Elmhurst, Queens. The latest DOB status is pending plan examiner assignment.

The filing is waiting for DOB to assign an examiner. Review has not started. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q08020327-Z2

86-53 Grand Avenue

Queens, NY 11373

New building · status dated Oct 23, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q08020327-Z2 as a new building at 86-53 Grand Avenue, Queens, NY 11373. Its latest published status category is Under review, dated Oct 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Oct 23, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4625499
FiledOct 23, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a government property built in 2025, on a 5,000 sq ft lot.

Built
2025
Last altered
2023
Residential units
0
Building type
Government property
Land use
Public facilities and institutions
Zoning district
R6
Lot area
5,000 sq ft
Building area
18,523 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q08020327-Z2.

    01
  2. Current status updated

    The latest recorded filing status is “Pending Plan Examiner Assignment.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q08020327-Z2
BBL
4024770026
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source