What the filing says
A public-record reading of the proposed work.
Curb cut installation filed in conjunction with nb b01427798-i1
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story factory or industrial building built in 1956, on a 13,000 sq ft lot.
- Built
- 1956
- Last altered
- 1988
- Floors
- 1
- Residential units
- 0
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-1
- Lot area
- 13,000 sq ft
- Building area
- 12,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 16 notices on file; the most recent was issued Dec 13, 2006.
- Construction
Issued Dec 13, 2006 — REVOCATION OF PERMIT NOTED:BOROUGH COMMISSIONER HAS ISSUED A LETTER OF INTENT TO REVOKE APP# 300875239 ON 12/07/06.UNABLE TO DETERMINE % OF WORK COMPLETED REMEDY:COMPLY WITH STOP WORK ORDER.CALL DOB@(718/802/3685) FOR RE-INSPECTION.MAKE SITE SAFE
- Local law 62/91 - boilers
Issued Feb 13, 2004
- Local law 62/91 - boilers
Issued Feb 13, 2004
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01427798-S8.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01427798-S8
- BIN
- 3334744
- BBL
- 3018970049
- Postal code
- 11205 · 2605 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 9
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 48