What the filing says
A public-record reading of the proposed work.
Replace existing bathroom and kitchen plumbing fixtures on existing rough-ins. replace gas piping and gas ranges on new rough-ins. install cellar gas piping and connect to existing meters, boilers and water heaters. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1935, with 3 homes, on a 2,400 sq ft lot.
- Built
- 1935
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R4
- Lot area
- 2,400 sq ft
- Building area
- 1,956 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Mar 7, 2025.
- Construction
Issued Mar 7, 2025 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2 ABUTTNG/CONNECTD TO 152 BROADWAY.EXTERIOR SHEATHNG DETERIORATD W/O PROPER WEATHER PROTECTION.NO PERMTS OR JOBS ON FILE FOR THE BLDG.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 4/28/25
- Construction
Issued Dec 22, 2024 — PREMISE NON COMPLIANT: DUE TO A FIRE AT THE PREMISE CAUSING DAMAGE TO THE ROOF,EXPOSURE 4 WALL, CEILINGS,DOORS,WINDOWS RENDERING THE PREMISE NON COMPLIANT AT TIME OF INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01199237-S2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01199237-S2
- BBL
- 4093400160
- Postal code
- 11418 · 141 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








