NYC DOB record · B01161645-S9

87 Winthrop Street

87 Winthrop Street, Brooklyn, NY 11225

New building filing in Prospect Lefferts Gardens-Wingate, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01161645-S9

87 Winthrop Street

Brooklyn, NY 11225

New building · status dated Sep 16, 2026

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01161645-S9 as a new building at 87 Winthrop Street, Brooklyn, NY 11225. Its latest published status category is Recorded as completed, dated Sep 16, 2026. The filing records 4 proposed stories and 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Sep 16, 2026
Proposed scale
4 proposed stories and 8 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3430479Applicant of recordSee the 2 filings that name Ee Building Services Inc
FiledDec 11, 2025
Current recordRecorded as completed
Proposed scale4 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Installation of new pipe scaffold as per plans

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story elevator apartment building built in 2025, with 8 homes, on a 3,781 sq ft lot.

Built
2025
Last altered
2025
Floors
5
Residential units
8
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
3,781 sq ft
Building area
9,925 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01161645-S9.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01161645-S9
BBL
3050450068
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
8
Scaffolding