NYC DOB record · Q01433060-I1

88-19 Francis Lewis Boulevard

88-19 Francis Lewis Boulevard, Queens, NY 11427

Alteration filing in Queens Village, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01433060-I1

88-19 Francis Lewis Boulevard

Queens, NY 11427

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01433060-I1 as a alteration filing at 88-19 Francis Lewis Boulevard, Queens, NY 11427. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 5 filings that name Maz 247 Corp
FiledAug 27, 2026
Current recordApproved
Proposed scale2 stories
Recorded cost$4,950

What the filing says

A public-record reading of the proposed work.

Application filed for repair minor water damage hole from roof as per plan. existing joist will unchange, fire happened in neiboreing house inside gc work done by job#440633245.no bulk change.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 1940, on a 2,000 sq ft lot.

Built
1940
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R3-2
Lot area
2,000 sq ft
Building area
1,536 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Aug 5, 2024.

  • Construction

    Issued Aug 5, 2024 — FAILURE TO MAINTAIN.BLDG SFFRD A 5-ALARM FIRE ON 8/3/24.ENT REAR DECK/ PORCH SEVERELY FIRE DMGD&APPRX 90%PRTLLY CLLPSD W/REMAINING WOOD FRAMNG SEVERELY CHARRD.OPEN HOLES IN ROOF.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 10/7/24,3.OBTN PRMTS& STRT WRK BY 10/21/24

  • Construction

    Issued Aug 3, 2024 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE DAMAGE INCLUDING BUT NOT LIMITED TO BURNED/CHATTED MEMBERS, MISSING AND/OR BROKEN WINDOWS,COMPROMISED FIRE RATING ALONG WITH OPEN ROOF.

  • Construction

    Issued Aug 3, 2024 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE DAMAGE INCLUDING BUT NOT LIMITED TO BURNED/CHATTED MEMBERS, MISSING AND/OR BROKEN WINDOWS,COMPROMISED FIRE RATING ALONG WITH OPEN ROOF.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01433060-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01433060-I1
BIN
4225809
BBL
4105810049
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
1
Proposed dwelling units
1
General constructionStructural work