What the filing says
A public-record reading of the proposed work.
Application filed for repair minor water damage hole from roof as per plan. existing joist will unchange, fire happened in neiboreing house inside gc work done by job#440633245.no bulk change.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 1940, on a 2,000 sq ft lot.
- Built
- 1940
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3-2
- Lot area
- 2,000 sq ft
- Building area
- 1,536 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Aug 5, 2024.
- Construction
Issued Aug 5, 2024 — FAILURE TO MAINTAIN.BLDG SFFRD A 5-ALARM FIRE ON 8/3/24.ENT REAR DECK/ PORCH SEVERELY FIRE DMGD&APPRX 90%PRTLLY CLLPSD W/REMAINING WOOD FRAMNG SEVERELY CHARRD.OPEN HOLES IN ROOF.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 10/7/24,3.OBTN PRMTS& STRT WRK BY 10/21/24
- Construction
Issued Aug 3, 2024 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE DAMAGE INCLUDING BUT NOT LIMITED TO BURNED/CHATTED MEMBERS, MISSING AND/OR BROKEN WINDOWS,COMPROMISED FIRE RATING ALONG WITH OPEN ROOF.
- Construction
Issued Aug 3, 2024 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE DAMAGE INCLUDING BUT NOT LIMITED TO BURNED/CHATTED MEMBERS, MISSING AND/OR BROKEN WINDOWS,COMPROMISED FIRE RATING ALONG WITH OPEN ROOF.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01433060-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01433060-I1
- BIN
- 4225809
- BBL
- 4105810049
- Postal code
- 11427 · 36 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








