What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 38-story condominium built in 1956, with 452 homes, on a 24,470 sq ft lot.
- Built
- 1956
- Last altered
- 2003
- Floors
- 38
- Residential units
- 452
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-9
- Lot area
- 24,470 sq ft
- Building area
- 366,023 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 169 notices on file; the most recent was issued Jun 12, 2025.
- Plumbing
Issued Jun 12, 2025 — BASED ON COMMISSIONER'S SUSPENSION NOTIFICATION INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB# M01193224 DUE TO SUSPENSION OF LICENSE MASTER PLUMBER# 001138. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT IMMEDIATELY.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2023 — CYCLE 9B UNSAFE REPORT FILED
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01287834-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01287834-I1
- BBL
- 1000187501
- Postal code
- 10006 · 111 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 458
- Proposed dwelling units
- 458








