NYC DOB record · B01334385-S3

88 Havemeyer Street

88 Havemeyer Street, Brooklyn, NY 11211

New building filing in Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 5, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01334385-S3

88 Havemeyer Street

Brooklyn, NY 11211

New building · status dated Oct 1, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
27
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01334385-S3 as a new building at 88 Havemeyer Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 6 proposed stories and 27 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
6 proposed stories and 27 proposed dwelling units
Applicant of recordSee the 155 filings that name Tsf Engineering, PC
FiledDec 23, 2025
Current recordApproved
Proposed scale6 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Propose sprinkler system as per plan for new 6 story with cellar mixed-use building, filed in conjunction with GC # B01334385-I1.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a garage or fuel station on a 3,825 sq ft lot.

Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
M1-2/R6A
Lot area
3,825 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 5, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01334385-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01334385-S3
BIN
3852513
BBL
3023680026
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
6
Existing dwelling units
Empty in the source
Proposed dwelling units
27