NYC DOB record · S01288911-S1

88 Woodland Avenue

88 Woodland Avenue, Staten Island, NY 10308

New building filing in Great Kills-Eltingville, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01288911-S1

88 Woodland Avenue

Staten Island, NY 10308

New building · status dated Oct 21, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01288911-S1 as a new building at 88 Woodland Avenue, Staten Island, NY 10308. Its latest published status category is Approved, dated Oct 21, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 21, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5177287Applicant of recordSee the 126 filings that name Joseph M. Morace, A.I.A., Architect
FiledJul 29, 2026
Current recordApproved
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Installation of new plumbing fixtures for a detached two-family dwelling.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

Zoning district
R3A

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01288911-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01288911-S1
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
2