What the filing says
A public-record reading of the proposed work.
Plumbing work is proposed for unit #10H on the 10th floor. A subsequent plumbing application will be filed. All work is in accordance with the submitted plans. There are no changes to use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1948, with 162 homes, on a 29,283 sq ft lot.
- Built
- 1948
- Last altered
- 1985
- Floors
- 20
- Residential units
- 162
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 29,283 sq ft
- Building area
- 322,346 sq ft
- Historic district
- Upper East Side Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 45 notices on file; the most recent was issued Dec 1, 2024.
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Construction
Issued Oct 19, 2013
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01145266-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01145266-S1
- BBL
- 1013840001
- Postal code
- 10021 · 321 filings
- Review type
- Standard Plan Examination
- Existing stories
- 19
- Proposed stories
- 19
- Existing dwelling units
- 162
- Proposed dwelling units
- 162