What the filing says
A public-record reading of the proposed work.
Proposed installation of pipe scaffold for existing building as per plans. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story office building built in 1918, on a 11,220 sq ft lot.
- Built
- 1918
- Floors
- 1
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- R6A
- Lot area
- 11,220 sq ft
- Building area
- 5,376 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Nov 10, 2025.
- Construction
Issued Nov 10, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION, EXPOSURE 1 CRACKS, MISSING STONE AND OPEN JOINTS. EXP2 CRACKS & DAMAGED STUCCO. EXP 3 CRACKS AND DAMAGED MASONRY. EXP 4 CRACKS & SPALLING STONE. REMEDY: REPAIR AND/OR REPLACE
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01466595-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01466595-I1
- BBL
- 3014790001
- Postal code
- 11221 · 3238 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








