What the filing says
A public-record reading of the proposed work.
Replace watersource heatpumps -two-5 tons, one -4 ton, one- 3 ton and one-1.5 ton. using existing ductwork, piping power and controls
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a condominium built in 2008, with 337 homes, on a 18,104 sq ft lot.
- Built
- 2008
- Residential units
- 337
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-6
- Lot area
- 18,104 sq ft
- Building area
- 401,085 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 79 notices on file; the most recent was issued Aug 30, 2013.
- No report and / or late filing (facade)
Issued Aug 30, 2013 — FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
- Construction
Issued Dec 6, 1999
- Construction
Issued Dec 6, 1999
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01409705-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01409705-I1
- BIN
- 1088533
- BBL
- 1008077502
- Postal code
- 10001 · 857 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 336
- Proposed dwelling units
- 336