What the filing says
A public-record reading of the proposed work.
The design aims to minimize interventions in the Plazas reconstruction and repair. Key upgrades and repairs include drainage, waterproofing, structural slabs, granite pavers, planting areas, ADA-compliant benches, and trees. ALL as per plan filed herewith
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story other built in 1995, on a 66,166 sq ft lot.
- Built
- 1995
- Floors
- 6
- Residential units
- 0
- Building type
- Other
- Land use
- Public facilities and institutions
- Zoning district
- C6-2
- Lot area
- 66,166 sq ft
- Building area
- 320,535 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 206 notices on file; the most recent was issued May 4, 1998.
- Local law 62/91 - boilers
Issued May 4, 1998
- Local law 62/91 - boilers
Issued May 4, 1998
- Local law 62/91 - boilers
Issued May 4, 1998
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01363097-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01363097-I1
- BBL
- 4096800001
- Postal code
- 11435 · 137 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0