What the filing says
A public-record reading of the proposed work.
Proposed renovations of existing 2-story building to repair fire damage . no structural work required. plumbing to be filed subsequently.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story one-family home built in 1915, on a 3,000 sq ft lot.
- Built
- 1915
- Floors
- 2.5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 3,000 sq ft
- Building area
- 1,534 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Apr 20, 2026.
- Construction
Issued Apr 20, 2026 — STRUCTURE IS RENDERED NON-COMPLIANT DUE TO FIRE WHICH HAS CAUSED EXTENSIVE WATER AND SMOKE DAMAGE THROUGHOUT THE PREMISES. SECTIONS OF WINDOWS HAVE BEEN REMOVED, LEAVING THE STRUCTURE OPEN TO THE ELEMENTS. ADDITIONALLY, WOOD JOISTS HAVE SUSTAINED FIRE DAMAGE, COMPROMISING STRUCTURAL INTEGRITY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01463019-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,006 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01463019-I1
- BIN
- 4196771
- BBL
- 4093540047
- Postal code
- 11418 · 156 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








