What the filing says
A public-record reading of the proposed work.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1962, with 150 homes, on a 104,752 sq ft lot.
- Built
- 1962
- Floors
- 6
- Residential units
- 150
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 104,752 sq ft
- Building area
- 152,100 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 30 notices on file; the most recent was issued Jun 8, 2026.
- Construction
Issued Jun 8, 2026 — FAILURE TO MAINTAIN PARKING STRUCTURE. NOTED: AT TIME OF INSPECTION,OB SERVED MULTIPLE AREAS THROUGHOUT THE PARKING STRUCTURE EXHIBITING VERT ICAL AND HORIZONTAL CRACKS IN THE WALLS AND CEILING. ADDITIONALLY SPAL LING CONCRETE EXPOSED RE-BARS WERE OBSERVED INDICATING DETERIORATION A ND LACK OF MAINTENANCE OF THE STRUCTURE. RED. RETAIN NYSPE WITH QPSI C
- Construction
Issued Apr 15, 2026 — REQUESTING FOR STRUCTURE STABILITY REPORT TO ASSESS THE STRUCTURAL STABILITY OF THE PARKING GARAGE STRUCTURE EXHIBITING VERTICAL AND HORIZONTAL CRACKS IN THE WALLS AND CEILINGS. ADDITIONALLY, THERE ARE AREAS OF MISSING STUCCO, EXPOSING REINFORCING STEEL (REBAR), INDICATING DETERIORATION AND LACK OF PROPER MAINTENANCE.
- Elevator
Issued Sep 23, 2021
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01132852-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01132852-I1
- BBL
- 4114340025
- Postal code
- 11414 · 43 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source