What the filing says
A public-record reading of the proposed work.
Interior renovation of existing 4-dwelling building at all floors with plumbing work as per plan filed herewith. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 4 homes, on a 2,400 sq ft lot.
- Built
- 1931
- Last altered
- 2020
- Floors
- 4
- Residential units
- 4
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 2,400 sq ft
- Building area
- 4,400 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 26, 2001.
- Construction
Issued Nov 26, 2001 — WORK WITHOUT A PERMIT: WORK NOTED OR ERECTED AT REAR YARD. A SHED APPROXIMATELY 16 FT LONG X 6FT DEEP BY 7 FT TO 8 FT PITCHED ROOF ATTACKED TO REAR OF ADJOINING BUUILDING AT 900 ATLANTICA AVENUE, ON PROPERTY LINE. REMEDY: OBTAIN A PERMIT OR RESTORE TO PRIOR LEGAL CONDITION
- Construction
Issued Nov 20, 2001 — WORK WITHOUT A PERMIT; WORK NOTED CONSTRUCTION OF A 25' X 10' X 9' SHED IN BACK OF PROPERTY THAT IS CONNECTED TO THE REAR OF BUILDING 900 LOCATED ON ATLANTIC AVENUE WHICH HAS CAUSED WATER TO LEAK IN STORAGE FACILITY. THE SHED IS MADE OF PLYWOOD & GALVANIZE SHEETS REMDY; OBTAIN PERMIT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00317376-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00317376-I1
- BIN
- 3027478
- BBL
- 3011220045
- Postal code
- 11238 · 2876 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4