What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story factory or industrial building built in 1931, on a 10,000 sq ft lot.
- Built
- 1931
- Last altered
- 2019
- Floors
- 2
- Residential units
- 0
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-2/R6A
- Lot area
- 10,000 sq ft
- Building area
- 16,205 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 18 notices on file; the most recent was issued Jun 8, 2026.
- Construction
Issued Jun 8, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING BRICK WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 4 ALSO DAMAGED/MISSING, MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Mar 31, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED @ EXP1 1FL CRACK, MISSING BRICK, OPEN JOINTS & 2FL VIEW MULTIPLE DEFECT THROUGH NETTINGS. EXPOSURE 4 OBSERVED SPALLING, DAMAGED JOINT & FAILED STUCCO. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 15, 2024 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: AT TIME OF INSPECTI IT WAS OBSERVED @ EXPOSURE 1 (S.ELEV)ERODED BRICKS & DETERIORATED MORTAR JOINTS, CRACKS, SPALLED BRICKS & FALLEN BRICK ON THE FLOOR. AT EXP 4 (E.ELEV) CRACKED STUCCO, SPALLED BRICKS & DETERIORATED MORTAR JOINTS WERE OBSERVED. REMEDY: REPAIR AND/OR REPLACE
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00002036-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00002036-I1
- BIN
- 2000765
- BBL
- 2023170019
- Postal code
- 10454 · 153 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source