What the filing says
A public-record reading of the proposed work.
Proposed lifts installation as per plans filed herewith. no change in use, egress, or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story garage or fuel station built in 1920, on a 5,046 sq ft lot.
- Built
- 1920
- Floors
- 3
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8B
- Lot area
- 5,046 sq ft
- Building area
- 16,488 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 27 notices on file; the most recent was issued Mar 26, 2025.
- Immediate
Issued Mar 26, 2025 — PROVIDE APPROXIMATELY 60 LINEAR FEET OF SIDEWALK SHED (SWS) AS FOLLOWS AT EXPOSURE 4,ERECT 60 LINEAR FEET OF SWS TO PROVIDE OVERHEAD PROTECTI ON FOR THE REAR YARD OF THE ADJ PROPERTY LOCATED @ 407 CENTRAL PARK WEST, THE SHED MUST FULLY COVER THE REAR YARD AREA OF 407 CNTERL PARK WEST
- Construction
Issued May 9, 2023 — EMERGENCY WORK ORDER DUE TO THE UNSAFE CONDITIONS CRACKED SPALLED MASONRY FACADE AND THE IMMED.HAZARD POSED ON SOUTH ELEVATION EXPO#1 TO PEDESTRIAN AND VEHICULAR TRAFFIC.REMEDY:OWNER MUST IMMEDIATELY INSTALL SIDE WALK SHED ON WEST 100TH TO SECURE& PROTECT PUBLIC SAFETY COMPLY WITH CODE
- Construction
Issued May 5, 2023 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED EXPO#2 DEFECTS ON MASONRY MISSING CEMENT CLADDING, MULTIPLE CRACKS. AT INTERIOR STAIRWELLS STEP MULTIPLE VERTICAL CRACKS, 2ND, 3RD FL. CONCRETE SLABS WITH SURFACE DETERIORATION. CELLAR SLAB SHOWS SEVERE SIGNS OF WEAR WITH RAIN WATER RETENTION FURTHERING DETERIORATION.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01171481-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,006 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01171481-I1
- BBL
- 1018360027
- Postal code
- 10025 · 749 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








