What the filing says
A public-record reading of the proposed work.
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01456052-I1
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 1920, on a 2,500 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R4-1
- Lot area
- 2,500 sq ft
- Building area
- 1,264 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Aug 28, 2026.
- Immediate
Issued Aug 28, 2026 — REMEDY: FULLY DEMOLISH THE BUILDING. GRADE AND FENCE SITE. PARTIALLY DEMOLISH THE UNDERMINED CONCRETE SLAB ALONG EXPOSURE #2, APPROX 4 FT WIDE BY 44 FT DEEP AND GRADE SITE
- Construction
Issued Aug 28, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #350809(082126FEU41201KR) DATED 08/21/26 REQUIRING OWNER TO IMMEDIATELY SUBMIT MEANS & METHODS FOR FULL DEMOLITION OF THE BLDG UNDER FULLTIME ONSITE PE SUPERVISION AS OF 08/28/26,NO DEMOLITION WORK HAS STARTED AT THE PREMISES IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #350809(082126FEU41201KR)
- Immediate
Issued Aug 22, 2026 — REMEDY: ERECT CONSTRUCTION FENCE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01458253-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01458253-I1
- BBL
- 4099040024
- Postal code
- 11423 · 50 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1