What the filing says
A public-record reading of the proposed work.
Application being filled to install roof dormer at left side of building for existing two-family dwelling units to comply ecb violation# 39171278y & DOB violation#vio25-03320. no change in use egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story two-family home built in 1925, on a 2,400 sq ft lot.
- Built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3-2
- Lot area
- 2,400 sq ft
- Building area
- 1,568 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Dec 23, 2025.
- Construction
Issued Dec 23, 2025 — ATOI, OBSERVED UNPERMITTED VERTICAL AND HORIZONTAL EXTENSION AT EXP 2, A ROOF DORMER WAS ADDED. EXTENDING FROM EXP. 1 TO EXP. 3, APPROX. 8FT(H) BY 8FT(W) BY 40FT(D).
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01360131-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01360131-I1
- BIN
- 4223085
- BBL
- 4104840129
- Postal code
- 11423 · 81 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2