What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 27-story elevator apartment building built in 1969, with 397 homes, on a 23,902 sq ft lot.
- Built
- 1969
- Last altered
- 2003
- Floors
- 27
- Residential units
- 397
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C6-9
- Lot area
- 23,902 sq ft
- Building area
- 335,114 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 158 notices on file; the most recent was issued Jan 12, 2026.
- Construction
Issued Jan 12, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION, OBSERVED SHATTER LAMINATION GLASS OF CANOPY ATOP OF MAIN ENTERANCE AT EXPOSURE 1 EAST ELEVATION. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 31, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DAMAGED/MISSING FLASHING AT ROOF LEVEL AND SPALLING SLAB WITH EXPOSED REBAR. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Dec 15, 2023 — EMERGENCY WORK ORDER DUE TO UNSAFE CONDITIONS MISSING FACADEPANNELS O SURE OF THE BUILDINGREMEDY;REPAIR OR REPLACE UNSAFE CONDITIONS.BY A LP
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00419018-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00419018-I1
- BIN
- 1000793
- BBL
- 1000170029
- Postal code
- 10006 · 68 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 397
- Proposed dwelling units
- 397