NYC DOB record · X00300172-I1

903 Summit Avenue

903 Summit Avenue, Bronx, NY 10452

Alteration filing in Highbridge, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00300172-I1

903 Summit Avenue

Bronx, NY 10452

Alteration filing · status dated Oct 9, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
54
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00300172-I1 as a alteration filing at 903 Summit Avenue, Bronx, NY 10452. Its latest published status category is Approved, dated Oct 9, 2026. The filing records 54 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 9, 2026
Proposed scale
54 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 2003406Applicant of recordSee the 408 filings that name Dooling & Company Architects
FiledJan 30, 2020
Current recordApproved
Proposed scale54 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of sidewalk shed as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1925, with 54 homes, on a 10,457 sq ft lot.

Built
1925
Last altered
1990
Floors
5
Residential units
54
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-1
Lot area
10,457 sq ft
Building area
39,225 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 25 open notices on record for this building, out of 28 notices on file; the most recent was issued Jun 24, 2026.

  • Construction

    Issued Jun 24, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE.AS NOTED AT TIME OF INSPECTION,NUMEROUS VERTICAL STEP CRACKS AS WELL AS NUMEROUS SPALLING,MISSING AND DETERIO RATED MORTAR,VERTICAL CRACKS THROUGHOUT EXPOSURE 1,2,3,4.REMEDY:REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Apr 7, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING STUCCO ON EXPOSURE 4 NORTH ELEVATION IN MULTIPLE LOCATIONS. REMEDY: REPAIR AND OR REPLACE

  • 22 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00300172-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00300172-I1
BBL
2025230043
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
54
Proposed dwelling units
54
Sidewalk shed