What the filing says
A public-record reading of the proposed work.
Minor structural work: drilling new two circular openings (8") for water tank risers through existing concrete slab with roof and slab steel reinforcement. work in conjuction with architectural and plumbing job # 322059320. no change in egress oroccupany.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story elevator apartment building built in 1964, with 387 homes, on a 86,400 sq ft lot.
- Built
- 1964
- Floors
- 22
- Residential units
- 387
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 86,400 sq ft
- Building area
- 447,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 86 notices on file; the most recent was issued May 16, 2024.
- Construction
Issued May 16, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT TIME OF INSPECTION,THERE ARE SPALLING BRICKS,EYEBROWS,AND BALCONY SLABS AT MULTIPLE LOCATIONS,AT EXP1 SOUTH ELEV AND EXP3 NORTH ELEV.AT EXP2 WEST ELEV,MISSING BRICKS AT MULTIPLE FLOORS.AT EXP4 EAST ELEV,SPALLING EYEB ROWS AT MULTIPLE FLOORS.REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE
- Hazardous condition (facade)
Issued Jan 27, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Construction
Issued Aug 25, 2022 — FTM EXTERIOR BLDG WALLS AND APPURTENANCES. EXP1 ,2,3 AND 4-CRACKS AND SPALLING EYE BROWS AT SEVERAL FLOORS ALSO AC INADEQUATELY SUPPORT AT SEVERAL FLOORS. EXP 1 AND 3 SPALLING BALCONY SLABS. EXP1 SOUTH EAST END OF SOUTH ELEVATION-VERTICAL CRACK ON BRICKS ON 5FL. REMEDY: MAINTAIN EXTERIOR BLDG WALLS AND APPURTENANCES. PROV SAFETY MEASURES
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00469746-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00469746-I1
- BBL
- 3030600075
- Postal code
- 11206 · 3085 filings
- Review type
- Standard Plan Examination
- Existing stories
- 22
- Proposed stories
- 22
- Existing dwelling units
- 387
- Proposed dwelling units
- 387








