What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed, overhead protection, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story care home built in 1910, with 120 homes, on a 5,730 sq ft lot.
- Built
- 1910
- Last altered
- 1985
- Floors
- 7
- Residential units
- 120
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- C6-1G
- Lot area
- 5,730 sq ft
- Building area
- 38,961 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 55 notices on file; the most recent was issued May 14, 2024.
- Hazardous condition (facade)
Issued May 14, 2024 — CYCLE 9C UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Local law 62/91 - boilers
Issued Feb 10, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00876125-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00876125-I1
- BIN
- 1003541
- BBL
- 1002820031
- Postal code
- 10002 · 192 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 19
- Proposed dwelling units
- 19