NYC DOB record · B01457988-I1

92 Brooklyn Avenue

92 Brooklyn Avenue, Brooklyn, NY 11216

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01457988-I1

92 Brooklyn Avenue

Brooklyn, NY 11216

Alteration filing · status dated Oct 22, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01457988-I1 as a alteration filing at 92 Brooklyn Avenue, Brooklyn, NY 11216. Its latest published status category is Approved, dated Oct 22, 2026. The filing records 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 22, 2026
Proposed scale
8 proposed dwelling units
Applicant of recordSee the 244 filings that name Asr Engineering PC
FiledSep 10, 2026
Current recordApproved
Proposed scale8 units
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1905, with 8 homes, on a 2,000 sq ft lot.

Built
1905
Floors
4
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,000 sq ft
Building area
3,376 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 38 notices on file; the most recent was issued Aug 8, 2025.

  • Construction

    Issued Aug 8, 2025 — OBSERVED AT A 4 STORY MULTIPLE DWELLING WORK BEING CONDUCTED UNDER ACTIVE JOB # B00997119-I1 WHERE FLOOR JOIST HAVE BEEN REMOVED AND NO TEMPORARY BRACING IS IN PLACE. THE UNBRACED WALLS POSE AN UNSAFE STRUCTURAL CONDITION FOR THE ENTIRE BUILDING.

  • Fail to certify class

    Issued Jun 26, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Construction

    Issued Jan 25, 2018 — FTM.PREMISES IS 4 STRY+BSMT WOOD FRAMED W/MASONRY BEARING WALLS RESID 94 BROOKLYN AVE SUFFERED A FIRE ON 1/17/18.THERE ARE OPEN HOLES AT ROOF.REMEDY:REPAIRS TO BE DONE UNDER PERMIT.OBTAIN PERMIT NO LATER THAN 03/23/18.PERMIT SIGNOFF NO LATER THAN 06/29/18

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01457988-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01457988-I1
BIN
3030113
BBL
3012080045
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
8
Proposed dwelling units
8
Scaffolding