What the filing says
A public-record reading of the proposed work.
Installation of 120' new sidewalk shed at 924 manhattan ave as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1931, with 4 homes, on a 1,875 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 4
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 1,875 sq ft
- Building area
- 3,750 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 14 notices on file; the most recent was issued Sep 18, 2026.
- Immediate
Issued Sep 18, 2026 — REPAIR APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED ALONG MANHATTAN AVENUE TO SAFEGUARD THE PUBLIC
- Immediate
Issued Sep 18, 2026
- Construction
Issued Sep 17, 2026 — STRUCTURE RENDERED NON-COMPLIANT DUE TO A VEHICLE IMPACTING SIDEWALK SHED AT EXPOSURE #1 MANHATTAN AVE COMPROMISING THE SIDEWALK SHED STRUCTURE LEAVING VERTICAL UPRIGHT POLES DISPLACED/LEANING AND CROSS BRACES COMPROMISED (BENT) PUSHING OUT OF ALIGNMENT
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01482973-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01482973-I1
- BBL
- 3025510001
- Postal code
- 11222 · 3462 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








