What the filing says
A public-record reading of the proposed work.
Filing for new plumging fixture and equipment in new location. all plumbing fixtures to be connected to existing risers. no chenge to use egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story condominium built in 1924, with 91 homes, on a 12,422 sq ft lot.
- Built
- 1924
- Last altered
- 2012
- Floors
- 17
- Residential units
- 91
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4A
- Lot area
- 12,422 sq ft
- Building area
- 132,235 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 105 notices on file; the most recent was issued May 2, 2024.
- Failure to
Issued May 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Elevator
Issued Mar 16, 2021
- Elevator
Issued Mar 15, 2021
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01416350-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01416350-S1
- BBL
- 1001737504
- Postal code
- 10013 · 492 filings
- Review type
- Standard Plan Examination
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 91
- Proposed dwelling units
- 91








