What the filing says
A public-record reading of the proposed work.
This application is to file alt-3 job with subsequent filing in conjunction with job#321141572 for installation of construction fence to safeguard the property during construction as per plan. no change in use, egress, and/or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1940, with 3 homes, on a 2,224 sq ft lot.
- Built
- 1940
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R5
- Lot area
- 2,224 sq ft
- Building area
- 2,812 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 9 notices on file; the most recent was issued Aug 20, 2024.
- Construction
Issued Aug 20, 2024 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321141572 IMMEDIATELY DUE TO THE APPLICANT OF RECORD HAS WITHDRAWN FROM THE PROJECT THEREFORE, THE APPLICANT FAILS TO SET FORTH THE FULL NAME, ADDRESS, TELEPHONE NUMBER EMAIL ADDRESS OF THE APPLICANT IN VIOLATION OF SECTION 28-104.8.3.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00266556-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00266556-I1
- BIN
- 3107793
- BBL
- 3048420018
- Postal code
- 11203 · 1387 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 3