What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with 2022 NYC building code,chapter 33
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1930, on a 2,500 sq ft lot.
- Built
- 1930
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C6-3A
- Lot area
- 2,500 sq ft
- Building area
- 3,150 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Oct 2, 2026.
- Immediate
Issued Oct 2, 2026 — INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 (ATLANTIC AVENUE) INCLUDING A 5' EXTENSION AT EXPOSURE 4 PROPERTY 942 ATLANTIC AVENUE TO SAFEGUARD THE PUBLIC AND PROPERTY
- Construction
Issued Oct 1, 2026 — FTM-THE ADJ EXP4 PROPERTY 942 ATLANTIC AVE WAS DEMOLISHED &GRADED.EXP 1/4 CORNER & EXP3/4 CORNERS OF BLDG ARE STRUCT COMPROMISED DUE TO IMPROPER/UNSAGE CONST/DEMO AT THE ADJ 942 ATLANTIC AVE.BLDG TO PERM REPAIRED/DEMOLISHED UNDER PERMIT STARTING BY 10/26/26 & SIGNED OFF/ COMPLETED BY 12/11/2026
- Construction
Issued Oct 1, 2026 — STRUCTURAL RENDERED NON-COMPLAINT, AT TIME OF INSPECTION OBSERVED BRICKS AT CORNER OF EXPOSURE 1,4 AND 3,4 IN STATE OF DISREPAIR DUE TO CONSTRUCTION ACTIVITIES AT 940 ATLANTIC AVENUE.
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01470655-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01470655-I1
- BIN
- 3027509
- BBL
- 3011240021
- Postal code
- 11238 · 2917 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0