What the filing says
A public-record reading of the proposed work.
Address ECB violations 39111964J and 39111963H by applying fire-stopping at cellar ceiling and installing wood studs on existing structure. No change in use, occupancy, or egress is under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.75-story walk-up apartment building built in 1915, with 4 homes, on a 5,630 sq ft lot.
- Built
- 1915
- Floors
- 2.75
- Residential units
- 4
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R4A
- Lot area
- 5,630 sq ft
- Building area
- 4,060 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Apr 17, 2024.
- Construction
Issued Apr 17, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: OBSERVED CELLAR AT THIS LOCATION HAS BEEN ILLEGALLY EXCAVATED APPROXIMATELY 4 FEET DEEP AT SIDE OF LOAD- BEARING WALL TO CREATE MORE SPACE AS THE EXTENT OR SCOPE OF THE EXCAVATION COULD POTENTIALLY COMPROMISE THE STRUCTURE'S STABILITY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01235063-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “On Hold – Administrative Action.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01235063-I1
- BIN
- 4199584
- BBL
- 4094540018
- Postal code
- 11419 · 114 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2