NYC DOB record · B01172395-P3

95 Linden Boulevard

95 Linden Boulevard, Brooklyn, NY 11226

Alteration filing in East Flatbush-Erasmus, Brooklyn. The latest DOB status is chief plan examiner/ assistant chief plan examiner review.

A senior plan examiner is reviewing the application. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01172395-P3

95 Linden Boulevard

Brooklyn, NY 11226

Alteration filing · status dated Aug 21, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
120
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01172395-P3 as a alteration filing at 95 Linden Boulevard, Brooklyn, NY 11226. Its latest published status category is Under review, dated Aug 21, 2026. The filing records 120 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Aug 21, 2026
Proposed scale
120 proposed dwelling units
Complete building dossierView all 5 filings associated with BIN 3116662
FiledAug 17, 2026
Current recordUnder review
Proposed scale120 units
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1927, with 120 homes, on a 42,750 sq ft lot.

Built
1927
Last altered
2016
Floors
6
Residential units
120
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
42,750 sq ft
Building area
139,808 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 67 notices on file; the most recent was issued Oct 4, 2017.

  • Construction

    Issued Oct 4, 2017 — STRUCTURE RENDERED NON COMPLIANT NOTED DUE TO EXCAVATION WORK AT EXPOSURE (2) OF ADJACENT PROPERTY 123 LINDEN BLVD SECTION OF KNEE WALL SEPARATED AND COLLAPSE INTO EXCAVATED AREA

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01172395-P3.

    01
  2. Current status updated

    The latest recorded filing status is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01172395-P3
BBL
3050840097
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
120
Proposed dwelling units
120