What the filing says
A public-record reading of the proposed work.
Northeast pavilion-structural work in conjunction with construction of new 1 story + cellar restroom and storage utility building within prospect park.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story outdoor recreation facility built in 2013, on a 17,142,400 sq ft lot.
- Built
- 2013
- Floors
- 1
- Residential units
- 0
- Building type
- Outdoor recreation facility
- Land use
- Open space and outdoor recreation
- Zoning district
- PARK
- Lot area
- 17,142,400 sq ft
- Historic district
- Scenic Landmark
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 83 notices on file; the most recent was issued Oct 1, 2012.
- Elevator annual inspection /
Issued Oct 1, 2012 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
- Elevator annual inspection /
Issued Dec 13, 2011 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
- Elevator annual inspection /
Issued Oct 8, 2010
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01026893-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01026893-S2
- BBL
- 3011170001
- Postal code
- 11215 · 2962 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 1
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 0








