NYC DOB record · M01033437-S1

95 West 119 Street

95 West 119 Street, Manhattan, NY 10026

Alteration filing in Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01033437-S1

95 West 119 Street

Manhattan, NY 10026

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
45
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01033437-S1 as a alteration filing at 95 West 119 Street, Manhattan, NY 10026. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 7 proposed stories and 45 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
7 proposed stories and 45 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1053232Applicant of recordSee the 47 filings that name Socotec INC.
FiledJun 12, 2025
Current recordApproved
Proposed scale7 stories
Recorded cost$1.4M

What the filing says

A public-record reading of the proposed work.

Limited exterior repair in conjunction with renovation of 7-story nycha multiple dwelling throughout. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1899, with 46 homes, on a 6,432 sq ft lot.

Built
1899
Last altered
1980
Floors
7
Residential units
46
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-2
Lot area
6,432 sq ft
Building area
38,178 sq ft
Historic district
Mount Morris Park Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01033437-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01033437-S1
BBL
1017180001
Review type
Professional Certification
Existing stories
7
Proposed stories
7
Existing dwelling units
45
Proposed dwelling units
45
General construction